Fee-charging Standards of Processing Telecommunications Management

2021-11-19
播放模式
手機睡眠
語音選擇
Article 1
The Standards are enacted pursuant to Article 92 of the Telecommunications Management Act (hereinafter referred to as the Act).
Article 2
Registration for telecommunications enterprises shall be charged as follows:
1. Those with paid-in capital of less than NT$5,000,000 shall be charged NT$500 per case.
2. Those with paid-in capital of NT$5,000,000 or more but less than NT$10,000,000 shall be charged NT$1,000 per case.
3. Those with paid-in capital of NT$10,000,000 or more but less than NT$50,000,000 shall be charged NT$2,500 per case.
4. Those with paid-in capital of NT$50,000,000 or more but less than NT$100,000,000 shall be charged with NT$12,500 per case.
5. Those with paid-in capital of NT$100,000,000 or more shall be charged NT$25,000 per case.
When applying for a registration in accordance with Paragraph 1 of Article 83 of the Act, telecommunications enterprises that have obtained an approval or franchise; or have been granted qualification for the establishment pursuant to the Telecommunications Act shall be exempt from the charges as described in the preceding Paragraph.
Those who apply for renewal of registration certificate due to amendments to the descriptions thereof shall be charged NT$500.
Article 3
With respect to the inspection of telecommunications service quality, an inspection fee of NT$250,000 shall be charged per case.
Article 4
With respect to the review of accounting standard operating procedures manual for enterprises with significance in the market, a review fee of NT$300,000 shall be charged per case.
Article 5
With respect to the review, compliance approval and examination of established public telecommunications network, the review fee, compliance approval fee or examination fee are shown in the Attached Table 1.
  • Attached Table 1 Public Telecommunications Network Statutory Fee-charging Standards.pdf
Article 6
With respect to the compliance approval for information and communications equipment used by the critical telecommunications infrastructure, the compliance approval fee or certificate fee are shown in the Attached Table 2.
The compliance approval fee for those who apply for compliance approval for information and communications equipment used by the critical telecommunications infrastructure within the same product series shall be halved.
  • Attached Table 2 Statutory Fee-Charging Standards of Information and Communications Equipment used by Critical Telecommunications Infrastructure.pdf
Article 7
With respect to the review and compliance approval for established radio station, the review fee, compliance approval fee or certificate fee are shown in the Attached Table 3.
Where the same applicant applies for a review or compliance approval for microwave station, radio station, television station or school-training radio station located in different locations, the review fee or compliance approval fee thereof shall be charged per location. If two or more stations are located in the same place, the applicant shall be charged for only one case.
  • Attached Table 3 Radio Station Statutory Fee-charging Standards.pdf
Article 8
With respect to building telecommunications equipment and space for related installation, the review fee, compliance approval fee or certificate fee derived from reviewing the design layout and compliance approval of the upon completion are shown in the Attached Table 4.
The design layout of building telecommunications equipment and space for related installation includes the cable narrow-band, cable wide-band and fiber cable floor plan and ascending location chart. Those that submit the applications together shall be charged the cable narrow-band review fee; for those that apply for the review separately shall be charged the respective review fee.
With respect to the completion of the compliance approval for building telecommunications equipment and space for related installation, the applicant shall be charged the compliance approval fee according to the cable type of compliance approval. Nevertheless, if cable wide-band and fiber cable distribution are installed simultaneously in the same building, the compliance approval fee shall be charged according to the higher fee according to the fee charge standards.
Where an amendment is made to the design of the building telecommunications equipment and space for related installation, it is necessary to re-apply for reviewing the new design layout of building telecommunications equipment and space; the applicant shall be charged the review fee. Nevertheless, a design change involving any of the following circumstances, shall result in only 80% of the review fee being charged accordingly:
1. The total number of building floors has changed.
2. The usage of the building has changed.
3. The floor location of telecommunications room is different from the design layout
  • Attached Table 4 Statutory Fee-charging Standards of Building Telecommunications Equipment and Space for Related Installation.pdf
Article 9
With respect to the issuance, renewal or replacement of telecommunications engineering license, a certificate fee of NT$900 shall be charged per license.
Article 10
With respect to the review and compliance approval for established dedicated telecommunications network, the review fee, compliance approval fee or certificate fee are shown in the Attached Table 5.
  • Attached Table 5 Dedicated Telecommunications Network Statutory Fee-charging Standards.pdf
Article 11
With respect to the review and compliance approval for amateur radio station; or the amateur radio operator and station license, the review fee, compliance approval fee or certificate fee are shown in the Attached Table 6.
  • Attached Table 6 Amateur Radio Operator and Station Statutory Fee-charging Standards.pdf
Article 12
With respect to reviewing telecommunications enterprises’ applications for radio frequency allocation, the review fee is shown in the Attached Table 7.
  • Attached Table 7 Statutory Fee Charge Standard for Telecommunications Enterprises Applying for the Allocation of Radio Frequency.pdf
Article 13
With respect to the compliance approval and registration of telecommunications terminal equipment, the compliance approval fee, certificate fee, registration fee or setup fee are shown in the Attached Table 8.
Where the telecommunications terminal equipment that is under the application for type compliance approval is a series product, the compliance approval fee derived therefrom shall be halved.
Where the same applicant applies for a compliance approval for more than two private-use telecommunications terminal equipment of the same brand and model, the compliance approval fee of the second and after products shall be halved.
  • Attached Table 8 Telecommunications Terminal Equipment Statutory Fee-charging Standards.pdf
Article 14
With respect to the compliance approval and registration of controlled telecommunications radio-frequency devices, the compliance approval fee, certificate fee, registration fee or setup fee are shown in the Attached Table 9.
Where the controlled telecommunications radio-frequency devices that is under the application for type compliance approval is a series product, the compliance approval fee derived therefrom shall be halved.
Where the same applicant applies for a step-by-step compliance approval or a compliance approval for more than two private-use controlled telecommunications radio-frequency devices of the same brand and model, the compliance approval fee of the second and after products shall be halved.
Those that apply for an import certificate for controlled telecommunications radio-frequency devices online shall be charged a review fee. No certificate fee shall be charged.
  • Attached Table 9 Controlled Telecommunications Radio-frequency Device Statutory Fee-charging.pdf
Article 15
Where the compliance approval certificate of design of building telecommunications equipment and space for related installation; telecommunications terminal equipment; or controlled telecommunications radio-frequency devices or the declaration of conformity (DoC) thereof are lost or damaged or the matters specified thereon are altered, any replacement or renewal request shall be charged a certificate fee according to these standards.
Article 16
Except in the case of over-payment, payment by mistake or by stipulation any other regulation provided, the payment shall not be returned after the applicant has paid the Statutory Fee according to these standards.
Article 17
These standards shall become effective on July 1, 2020.